Village Center Station I, II, III/CoBank

Village Center Station I, II, III/CoBank

Group14 Services

LEED Consulting – phases I and III
LEED Documentation – phases I and III
Energy Modeling – all phases
Xcel Energy – Energy Design Assistance (EDA) – all phases
Fundamental and Enhanced Commissioning (Cx) – all phases

Snapshot

City – Greenwood Village, CO
Project Size –
515,000 SF (phase I)
230,000 SF (phase II)
320,000 SF (phase III)
LEED CS Gold (phase I)
LEED CS Gold (phase II)
LEED CS Silver (phase III)

Overview

Village Center Station is the premier, mixed-use, transit-oriented development in Denver, Colorado’s Southeast Suburban submarket. Situated on 12.64 acres of prime real estate, VCS offers unprecedented access, visibility, and prominence at Southeast Denver’s Arapahoe Station light rail stop.

A three-acre plaza of inviting shops, trendy restaurants, and attractive outdoor seating, occupies an 800-foot-long textured granite boulevard enhanced with Colorado native landscape elements. The plaza emphasizes pedestrian friendly environments.

Results

  • VCS I achieved LEED Gold and was awarded the 2009 “Colorado Energy Efficiency Award” through Xcel’s Energy Design Assistance Program
  • VCS II is Class AA office and retail space with immediate access to light rail and bus transit seeking LEED Gold certification.
  • VCS III is a core and shell, eleven story 320,000 sf, office building along with a six level 950 space parking structure. Goal of LEED Silver Core & Shell certification.

1325 East 16th Ave
Denver, CO 80218
(303) 861-2070

 

135 East Atlantic Ave
Delray Beach, FL 33444
(561) 270-5576

Drop us a line...

©2017 Group 14 Engineering. All rights reserved


Notice: ob_end_flush(): failed to send buffer of zlib output compression (0) in /home/group14/public_html/wp-includes/functions.php on line 4339